
Everyone sees what matters.
Everything stays connected.
The Manager runs the studio; the Coach prepares classes. Independent Member purchases and bookings are rolling out. Access depends on the role.
Your priorities, then the detail.
Essential, Smart and Advanced: three Manager modes, with the same data and permissions. These are not pricing plans. Smart is the planned default.
Availability: Essential and initial Smart building blocks are planned for the first release; Smart grows during the pilot and Advanced follows.
The planned Smart journey: SPOT → EXPLAIN → SIMULATE → QUANTIFY → DECIDE. Then measure the observed result.
- Day-to-day operations PilotScheduling and bookings tested in pilot.
- Offers & booking rulesThe catalogue and credit history are in pilot; subscriptions, overdue payment handling and advanced booking rules are rolling out.
- Understand an indicatorPlanned analysis: trace a figure back to its classes or transactions.
- Stay in control of actionsPermissions and confirmation are required for significant actions.
- Analysis & simulations RoadmapDiagnostics, simulations and campaigns are future steps, subject to validated data and controls.
Concrete scenario: compare two options for Tuesday evening. A sample example, without changing the live schedule.
Understand the Smart experience
Manager journey
Decide close to daily operationsTuesday evening classes account for 41% of the occupancy gap.
Explain, then simulate →
Reformer Flow
Reformer room · 11 bookings out of 12
Emma R.Present
Sofia M.Present
Lina B.Present
Nora G.To be confirmed
Future scenario: the Coach reports the issue; the Manager approves the assignment.
Prepare the next class.
In pilot, sessions and participants according to Coach permissions. Advanced features are still to come.
- Personal scheduleTime, activity and class status.
- Participants & attendanceA clear list to prepare and follow the session.
- AvailabilityAssignments can be viewed; reporting and assigning a replacement are future features.
- Coach analysis · coming laterFuture module and specific permission still to be confirmed.
- Incidents & context RoadmapReport a delay or absence; the Manager approves cover: a future journey, not enabled.
Concrete scenario: check the room, participants and assignment before class.
Manage bookings from your phone.
Journey rolling out: classes, credits and bookings in a mobile browser.
- Search & bookingClasses by date and activity; visible availability and waiting-list status.
- Offers, credits & subscriptionsPrices, validity and restrictions before payment; balances, renewal dates and history to track.
- Cancellation & consequencesRules, any penalty, credits and history visible before confirmation.
- Post-class satisfactionAfter attendance: rating, reason and optional comment; separate callback consent.
- External calendarsCalendar invitation or Google/Microsoft connection subject to validated scope, access and consent.
Concrete scenario: join the waitlist, then accept a place under the studio’s rules.
Mobile browser planned · a dedicated app may follow later.

Good evening Emma
Your next move
Your studio’s brand, the right access for everyone.
What your members and your team see, with the status of each capability.
Your brand first
The member journey carries your studio’s name, logo and colours, with a discreet “by GE2studio” signature.
Sign in with Google, Apple, Facebook or email
Members create their account on their own and sign in with Google, Apple, Facebook or email, without an extra password to remember.
A Staff role for the front desk
The front desk checks members in, creates a profile or takes a payment, with permissions limited to what the role needs.
WhatsApp assistant for members
Book, cancel or join a waitlist from WhatsApp, using the same rules as the app. No action without the member’s confirmation.
Listen after class,
act without overinterpreting.
Post-attendance pilot scenario: trends and feedback for the Manager; Coach access according to granted permissions.
Understand the protocolHow was your session?
A short question, followed by a conversation if needed.
Test your assumptions,
prepare your project.
Estimate an impact with the public calculator, separate from the future Manager simulator.

